location:Index > Factory > 

Source:YueFei Business consulting     Date:2022/2/12 21:10:02   |    Share    Collection   
WRAP is introduced:


WRAP is a combination of four abbreviations. WORLDWIDE RESPONSIBLE ACCREDITED PRODUCTION Global apparel Production social responsibility principles are the core criteria for production facilities participating in the WRAP certification program. The project aims to independently monitor and certify that manufacturing meets these global standards of social responsibility and that products are produced under legal, humane and ethical conditions. The WRAP certification program believes that factory-based certification, with consulting VBON, is the most effective way to ensure that the workplace complies with WRAP production principles. The WRAP program places the primary responsibility for improving workplace conditions on the owners who own and operate the facilities that manufacture sewn products.


WRAP factory certification for the United States clothing industry, mainly involved in the scope of human rights and anti-terrorism, the factory can apply for a third party audit body, the time is half notice audit, surprise period is 1 month. The evaluation results of WRAP certification are divided into A -- Platinum certificate (2 years validity), B -- gold certificate (1 year validity), C -- Silver certificate (half A year validity), if the factory does not get the certificate, it will follow up the audit in 3 months.






The certification process


A, simulation of self-evaluation: the factory internal related management personnel, in accordance with the WRAP audit requirements, establish a self-evaluation team or hire professional consulting institutions to simulate the factory itself, find out the loopholes or problems, improve the lack of, when the management team thinks that the factory basically meet the WRAP audit requirements, Can be submitted to the WRAP council certification application report to apply for WRAP factory inspection.


Audit, inspection: after application through, WRAP inspection board according to the authorization management team to make an appointment for the factory scheduling council on supervisor list any of the supervisors, by the supervisor to review factory, according to the review report to determine whether the factory conform to WRAP inspection principle, whether granting certification, as well as some supervision and guidance.


Three, review tracking: supervisor issued in line with the standard recommendation, the factory can formally submit to the WRAP factory inspection committee certification request, certification committee will list the certification details of the period of validity after the acceptance of the report, and urge the factory should accept random sampling, to review the certification results.


WRAP factory inspection application certification process:


Step 1: Register your business by submitting the registration form and paying the registration fee on the WRAP website.


Step 2: Self-Assessment The WRAP Self-Assessment and Monitoring Manual is available for download on the WRAP website.


Step 3: Field audit WRAP authorizes an accredited third party independent audit firm to conduct a field audit of the business and requires additional inspections and reports from the audit firm. Step 4: Evaluate the WRAP Employees take one of the following two steps:


(1) THE WRAP employee may notify the company to correct certain policies and request additional inspections and reports from the auditing firm. (2) THE WRAP employee may recommend that the WRAP Certification Committee approve certification. The certification board reviews and evaluates reports and evidence, and issues certificates to qualified enterprises. Certificates are valid for six months, one year or two years.






Apply to industry


1. Apparel industry (Apparels)


2. Electronic Industry (Electronics)


3. Footwear


4. Home Furnishings


5. Toys industry


Factory inspection needs to pay attention to the following major problems:


Safety exit problems, each floor at least two, in order to escape quickly, the nearest exit from the location of the people should not be more than 70 meters, emergency lights and must be installed on the safety door.


The fire exit door cannot open inwards it must open outwards. Because in an emergency, there's no reason for people to run away, and they all run to the door and if the door opens inward, it won't open, which makes things even more confusing. It would be different if the door opened outwards. Inspection details like this are very easy to do.


Instructions for the use of fire extinguishers should be in the local language. In addition, like elevators and boilers, there should be annual checks and records. Fire drills are conducted twice a year and have cameras and other related records. The previous article has been mentioned, do not think of any new ideas, what PS ah beautiful picture show, but any fraud will have loopholes, and these things are not difficult for the factory to achieve, therefore, the factory or spend some time to really do it.


In view of the increasing attention to privacy, WRAP factory inspection requirements of male and female staff dormitory separate, to protect the personal privacy of employees. In addition, wages and working hours must be reviewed, which is a common point of factory inspection.


 

【Related reading】:

Editor in charge:Shanghai Yue Fei Enterprise Management Consulting Co., Ltd.
Copyright:http://www.yf-iso.com/ Please indicate the source of the reprint

Tel:021-62201932   Phone:18916381081   
Add:Room 201, Ming Hui building, 442 Hami Road, Changning District, Shanghai

Shanghai Yue Fei Enterprise Management Consulting Co., Ltd. all rights reserved.  © All rights reserved.
yf-iso.com ICP:10202224