Share
Collection NADCAP Special Process Certification Scope Overview
NADCAP (National Aerospace and Defense Contractors Accreditation Program) is a certification program jointly initiated by major US aerospace and defense industry contractors, the U.S. Department of Defense, SAE, and other organizations. It is administered by PRI (Performance Review Institute). Currently, approximately 80 aerospace prime contractor subscribers recognize NADCAP, and over 2,000 suppliers worldwide have obtained NADCAP certification.
NADCAP covers 12 major commodity areas plus general requirements. Each commodity has multiple sub-items (slash sheets). Suppliers select their accreditation scope based on their actual business operations.
|
Item |
Description |
|
AC7102 |
Basic Checklist (General Requirements for Metallic Heat Treating) |
|
AC7102/1 |
Brazing |
|
AC7102/2 |
Aluminum Heat Treating |
|
AC7102/3 |
Carburizing |
|
AC7102/4 |
Nitriding |
|
AC7102/5 |
Hardness and/or Conductivity Testing |
|
AC7102/6 |
Hot Isostatic Pressing (HIP) |
|
AC7102/7 |
Induction Hardening |
|
AC7102/8 |
Pyrometry (AMS 2750) |
|
AC7102/9 |
Sintering |
|
AC7102/10 |
Localized Heat Treating |
|
Item |
Description |
|
AC7108 |
Basic Checklist |
|
AC7108/1 |
Application of Paint and Dry Film Lubricants |
|
AC7108/2 |
Etching and Etch Inspection Processes |
|
AC7108/3 |
Surface Preparation Prior to Metal Bonding |
|
AC7108/4 |
Solution Analysis and Testing |
|
AC7108/5 |
Alpha Case Removal and Chemical Milling |
|
AC7108/6 |
Cleanliness Verification |
|
AC7108/7 |
Vacuum Cadmium and IVD Aluminum |
|
AC7108/8 |
Anodize |
|
AC7108/9 |
Electroplating and Electroforming |
|
AC7108/10 |
Electroless Plating |
|
AC7108/11 |
Conversion Coating (Chromate, Phosphate, etc.) |
|
AC7108/12 |
Acid Cleaning, Descaling, Passivation and Electro-Polish |
|
AC7108/13 |
Brush Anodize and Plating |
|
AC7108/14 |
Stripping as a Sub-Contract Process |
|
Item |
Description |
|
AC7109 |
Basic Checklist |
|
AC7109/1 |
Thermal Spray |
|
AC7109/2 |
Vapor Deposit |
|
AC7109/3 |
Diffusion Processes |
|
AC7109/4 |
Stripping |
|
AC7109/5 |
Coating Evaluation Lab Practices |
|
AC7109/6 |
Plating of Coated Parts |
|
AC7109/7 |
Heat Treating for Suppliers of Coatings |
|
AC7109/8 |
Grinding of Coatings |
|
Item |
Description |
|
AC7110 |
Basic Checklist |
|
AC7110/1 |
Torch/Induction Brazing |
|
AC7110/2 |
Flash Welding |
|
AC7110/3 |
Electron Beam Welding (EBW) |
|
AC7110/4 |
Resistance Welding (Spot, Seam, Projection) |
|
AC7110/5 |
Fusion Welding (TIG/MIG) |
|
AC7110/6 |
Laser Beam Welding |
|
AC7110/7 |
Friction Stir Welding |
|
Item |
Description |
|
AC7114 |
Basic Checklist |
|
Methods Covered |
FPI (Fluorescent Penetrant), MPI (Magnetic Particle), UT (Ultrasonic), RT (Radiographic), ECT (Eddy Current), etc. |
|
Personnel Requirements |
Level I/II/III certification per NAS 410 standard |
|
Item |
Description |
|
AC7101/1 |
General Requirements for All Laboratories |
|
AC7101/2 |
Chemical Analysis |
|
AC7101/3 |
Mechanical Testing |
|
AC7101/4 |
Metallography & Microindentation Hardness |
|
AC7101/5 |
Macro Hardness Testing |
|
AC7101/6 |
Corrosion Testing |
|
AC7101/7 |
Mechanical Test Specimen Preparation |
|
AC7101/9 |
Specimen Heat Treating |
|
AC7101/11 |
Fastener Testing |
|
AC7101/14 |
Proficiency Testing and Internal Round Robin |
|
Item |
Description |
|
AC7117 |
Shot Peening Basic |
|
AC7117/1 |
Computer Controlled Peening |
|
AC7117/2 |
Automated Peening |
|
AC7117/3 |
Peen Forming |
|
AC7117/4 |
Flapper Peening |
|
AC7117/5 |
Manual Peening |
|
Item |
Description |
|
AC7116 |
Basic Checklist |
|
AC7116/1 |
Electrochemical Machining (ECM) |
|
AC7116/2 |
Electrochemical Grinding (ECG) |
|
AC7116/3 |
Electrical Discharge Machining (EDM) |
|
AC7116/4 |
Laser Beam Machining (LBM) |
|
AC7116/5 |
Laser Part Marking (LPM) |
|
AC7116/6 |
Spark Erosion Grinding (SEG) |
|
AC7116/7 |
Abrasive Water Jet Machining (AWJM) |
|
Item |
Description |
|
AC7119/AC7120 |
Electronic Assembly Basic |
|
AC7120/1 |
Personnel Certification (Internal certification system as alternative to IPC certification) |
|
AC7120/2 |
General Soldering of PBA (Core prerequisite for all other sub-items) |
|
AC7120/3 |
Plated Through Hole Technology (Requires /2) |
|
AC7120/4 |
Surface Mount Technology (SMT) (Requires /2) |
|
AC7120/5 |
BGA Mixed Metallurgy (Requires /2 + /4) |
|
AC7120/6 |
Lead-Free Soldering (Requires /2) |
|
AC7120/7 |
Conformal Coating |
|
AC7120/8 |
Potting |
|
AC7120/11 |
Rework & Repair |
|
AC7120/12 |
Depaneling |
|
AC7120/13 |
Space & Military Application Additional Requirements (Highest Level) |
|
Item |
Description |
|
AC7118 |
Composite Materials Manufacturing |
|
Item |
Description |
|
AC7112 |
Hydraulic/Fuel System Assembly |
|
Number |
Commodity |
Description |
|
AC7115 |
Elastomer Seals (SEAL) |
Elastomer Seals |
|
AC7200 |
Sealants (SLT) |
Sealants |
|
AC7004 |
Aerospace Quality Systems (AQS) |
Aerospace Quality Systems |
|
Number |
Description |
|
AC7000 |
NADCAP General Requirements (mandatory for all commodities) |
|
AC7004 |
Aerospace Quality Management System (additional audit required for organizations without AS9100 certification) |
|
AC7006 |
ISO/IEC 17025 Laboratory Management System |
The NADCAP accreditation follows a hierarchical structure from top to bottom:
AS9100 (Quality Management System Foundation)
└── AC7000 (NADCAP General Requirements)
└── Commodity Checklist (e.g., AC7102 Heat Treating)
└── Slash Sheet (e.g., AC7102/8 Pyrometry)
【Related reading】:
Editor in charge:Shanghai Yue Fei Enterprise Management Consulting Co., Ltd.
Copyright:http://www.yf-iso.com/ Please indicate the source of the reprint

